
Largest Off-Grid Poultry Farm in Australia
11kV private distribution network with 4.5km of overhead lines, switchgear, transformers, earthing, battery systems and substations.
Evaluation of HV earthing systems that goes beyond basic in-service resistance checks.
A compliant earth system is essential for the safe operation of high voltage distribution. If a fault occurs, the earthing system must carry fault current safely and keep the voltages people could touch within safe limits.
SPS goes beyond basic “in service” resistance measurements to deliver comprehensive evaluations of earthing systems.
[TODO] Client to confirm this list of inclusions for Earth Testing.

11kV private distribution network with 4.5km of overhead lines, switchgear, transformers, earthing, battery systems and substations.
Tell us what you need and where. We will come back to you with a quote or the next steps.