Call 1300 425 498Request a Quote
High & low voltage electrical engineering · Campbelltown NSWinfo@spark-ps.com.auLinkedIn

Testing & Commissioning

Testing and commissioning of HV and LV equipment, from power transformers to protection relays, documented at handover.

What it is

Testing and commissioning confirms that new, upgraded or modified electrical equipment has been installed correctly and performs as designed before it is energised and put into service.

SPS carries out testing and adjustment on equipment ranging from power transformers to protection relays. Each project is accompanied by a detailed report on system performance, integrity and compliance with electrical and safety standards.

When your site needs it

  • Before energising a new installation, substation or switchroom
  • After switchgear, transformers or protection relays are replaced or upgraded
  • When battery systems are added or a private HV network is extended
  • When the principal contractor or asset owner needs documented test results before handover

What’s included

  • Switchgear testing and commissioning
  • Protection relay programming, testing and commissioning, including Schneider and SEL relays
  • Power transformer testing
  • Voltage transformer (VT) and current transformer (CT) testing
  • Battery system commissioning
  • Coordination with other subcontractors on site
  • Detailed test reports and handover documentation

[TODO] Client to confirm this list of inclusions for Testing & Commissioning.

Project experience

Need testing & commissioning?

Tell us what you need and where. We will come back to you with a quote or the next steps.